Showing posts with label bom. Show all posts
Showing posts with label bom. Show all posts

Monday, June 21, 2010

Design Wall Monday

I make progress on all my projects this week.  I made more siggy blocks for the wedding quilt and finished piecing the blocks for the Cathedral Stars quilt.  I have a layout in mind for the siggy blocks and will continue making the remaining squares needed this week.  I will layout the Cathedral Stars blocks and mark the rows; this should be farily easy as I used many different fabrics so they shouldn't meet up too much.  I also think I'm going to change the setting triangles a little to finish off the design in the border.  "I can finally see the light at the end of the tunnel!"  Let's see...I only pieced 1,852 pieces for this quilt so far...

I do have a photo of the Memorial Day Quilt top in progress.  I added 3 borders since last week.  I still need to add 3 more plain borders to finish the top.  I changed the corner squares a little to make them "turn" the corner more smoothly by adding another flip square to each block.

On Saturday I collected block 11 of 12 from The Quilted Fox shop BOM.  We are making the same block but with different asian fabrics.  Here is an updated photo of my setting where I added another row this week.  On Sunday I cut the pieces for block 11 but didn't get around to piecing it.  So this week I hope to sew this block and add as much of row 4 as I possible can.  Thay way my top is almost finished; just waiting on block 12 next month.
--------------------------
Type-u-later,
Tea in MO
http://www.teaquilts.com

Monday, June 14, 2010

Design Wall Monday

Another design wall Monday is here.  I've been having very busy weeks not only with quilting but also with exercising and family events.  First up is that I got the rows sewed on the Memorial Day quilt in progress.  I decided to add another fabric for the first border (even though I had already cut the strips) and never got around to cutting the new fabric.

The reason the above quilt top was not completed was because Friday evening I decided to make siggy blocks for my step daughter's upcoming wedding in July.  The shower was Saturday so I decided to start making the blocks to get the bridal party signatures out of the way as most of them will be busy with wedding activities.  Here are some of the blocks.  I still need to make about 100 or so more to have enough for everyone to sign their name and relationship to the bride or groom.  This will be a lap quilt and as they use it they can sort out the various relatives and friends that's difficult to do when families merge.

My final photo this week is of the Quilted Fox BOM.  We have 2 more to go...

That's it for me.  To see more design wall, hop over here.
--------------------------
Type-u-later,
Tea in MO
http://www.teaquilts.com

Monday, May 3, 2010

Design Wall Monday

I’ve have been busy and not all of it sewing related. I have been line dancing at work during lunch for 2 months. Last week I realized that my recreational center also holds line dancing on Mondays and Wednesdays. I attended both days; had a lot of fun and even convinced my daughter to go with me on Wednesday. Now, that means I didn’t progress on much sewing and when I did, I started experimenting. And if that isn’t bad enough, I’m having problems with one knee that is slightly swollen (probably from the increased 4 hours of dancing.) I’m working on that but let’s move on to the sewing this week.


I did manage to get the borders on the scrappy bento box and now have a flimsy. I still need to get back pieced and make the binding.  It's folded in half though so use your imagination.  It's about twin size.


The batik bento box is still on my design wall. However, I did sew two bottom rows together. I was able to sew these together without the use of sashing. I haven’t had time to decide what border fabric I’ll use.


 I now have 152 4-patches made of the 305 needed. As you can see in the photo, I have more strips sewn and additional fabrics pressed for cutting strips. It’s going faster than I expected and now need to pick my other fabrics for the quilt. The pattern my scrap quilting club is using is Cathedral Stars. We are breaking down the steps in hopes that by the end of the year we will all have tops made.


I have progressing nicely on the Mountain Top blocks. I now have 9 of these pieced. This is my chaining project. It’s amazing what a little extra sewing can produce.


I also made block 9 of the Quilted Fox’s BOM. We make the same block every month using different fabrics. We meet on the 3rd Saturdays. So, when I do that, I can add it to the setting I’ve already started which is different than what the quilt shop is recommending. I’ve decided I don’t want to make a quilt like the other 200 or so participants.  (Pardon the messy photo.  The block was pinned on point to a quilt I use as a curtain with other projects and documentation on it as well.)

I’ve been reading a lot of blogs and found some interesting project possibilities. I found this exploding pineapple block that just look like a fun technique. Of course I tried it. I’ll use this pattern when cutting scraps (you know, the box that is overflowing very badly) instead of cutting any miscellaneous size and storing them.

While in Paducah I purchased a few charm square packs. I found this pattern and thought it would be interesting as well. I used two charm squares to make the test blocks. I like this one too, so I’m setting up a kit with the pattern for sometime down the road.  You get two identical blocks from 2 charm squares, but you twist one to the left and the other to the right.  This is now set up as a kit.

If I’m participating, I need challenge quilts for May and June. Prior to this, I hadn’t started anything and had no particular interest in making anything. I started this triple irish chain using scrappy fabrics. I thought I’d use the floral fabric in the border which lead to the colors I chose. However, after trying to work with the miniature blocks, I gave up as they are so catty wompus (sp), the seams are not matching and I DID NOT like it. Sometimes you just got to throw something in the trash and this was it. What was in my head definitely did not formulate into the end result. I did restart another miniature quilt. The top is hidden under the floral fabric. I now need to get it quilted and then add the binding. This one is due in May. I still have to decide what, if anything, I’ll do for the challenge due next month. That one is for our guild’s 25th anniversary. I have an idea, just not motivated yet to follow through.










To see more design walls, go toe Patchwork Times.
--------------------------
Type-u-later,
Tea in MO
http://www.teaquilts.com

Monday, February 1, 2010

Design Wall Monday

I finished my goal list with the exception of cleaning my studio.  However, I did clean the living room, kitchen and even the bathroom.  I just think "cleaning" and "studio" should not be in the same sentence.

Right after posting last week's Design Wall Monday, I went home and cut the blocks you see from a stripe fabric.  I've been wanting to try this since May of last year.  The fabric had been sitting in a chair since then.  I started off the week ignoring my goals list. I then regrouped and made myself finish the Playing Basketball quilt (see previous posts) before I could sew any blocks.  That done, I pin basted the Love is... quilt and it will get quilted hopefully by the end of the month.

Then I made the 3rd Saturday Sampler block (the last one on the bottom row.)  The shop has an optional setting block but I didn't want that as at least 100 people participate in this BOM.  I didn't want a quilt like everyone else in the group.  So, I pulled out Judy L.'s book, Nine Patch Extravaganza, I purchased last year and used a setting she had for 12" blocks.  I love the secondary design I got quite by accident as I did not plan it in EQ.

After the BOM I went back to the stripe blocks and sewed then into a quilt top.  It now need borders.  The extra blocks will be used on the back or maybe made into a charity quilt.  I have time to decide on that so I'm leaving it alone for now.

When Saturday came, I still needed to determine and piece borders for the Crazy About Hearts and Stars top.  Well, the plan took longer to execute than I thought.  It took all day Saturday and Sunday to get this thing just right (okay I have a few things that should be changed but I'm DONE.)  The quilt is 92x96 so I folded it to get a picture so you have an idea of the 3 borders I added to this quilt.  Hopefully I can use a friends longarm to quilt it as it's way too big for me to accomplish on my DSM.

The 4-patches were something that I chain sewed while working on the other projects.  I'm planning to use that technique where you cut a straight set top in strategic places, turn them and sew them back together.  The resulting top will be on point when done.  This experiment will be for a cousin in the military (hence the colors) who like "plain" quilts without a lot of fuss.

To see what others have on their design walls go here.

Goals for this week:

Not too much this week as I'm going out of town next weekend (not this one) and a retreat the following week-end.  In additon, I have 2 meetings this week so I'll not be at home much.  I will probably get more done, just don't want to put it in writing as then I'll push myself to do more than I want.  I think I want a quiet, relaxing week after piecing the borders on the patriotic quilt this past weekend.

1.  I'm visiting my friends in Atlanta and must make a tote bag for their daughter.
2.  Finish working on 4-patch blocks quilt top.
--------------------------
Type-u-later,
Tea in MO
http://www.teaquilts.com