Showing posts with label bath remodel. Show all posts
Showing posts with label bath remodel. Show all posts

Sunday, September 2, 2012

Bath Remodel - FINISHED

Yesterday the bathroom was completely finished.  I feel like I'm living inside of a HGTV home remodel program.  I just want to stand at the door and admire this beautiful room.  I need to purchase new trash can and soap dishes as the ones we purchased before the work began do not look good in the finished room.

I now have the remodel bug and will start shopping for supplies to get the kitchen done next year. This time I should be able to get better prices since I have a longer period to shop than I did with the bath.








-------------------------- Type-u-later, http://www.teaquilts.com

My day...

As I start typing this post, it's 11:53 p.m.  Don't quite know why I not asleep other that I'm excited with how my day progressed.

First, I posted about the bath remodel earlier in the week but received spam comments advertising remodeling supplies and services.  I attempted to delete the comments from my phone and instead deleted the post. Anyway, the most exciting part of my day was the completing of the bath remodel.  I guess I was too exhausted with the waiting to take finished photos; will upload a few.  Here is one wall from the previous post that was mistakenly deleted prior to grouting.  About Wednesday, I was getting a little testy with the inconvenience so I'm really excited that it's all over; it took almost two weeks.







My other exciting event was using a friend's long arm machine to quilt a few quilts.  Yesterday I pieced backs and cut batting for seven quilt tops. Here are photos of two of them on the frame; forgot to take the third photo.  I plan to go back tomorrow to quilt another 2-3 quilts, depending upon time. In my WIP stack, I have over 30 quilts that need quilting.


Have a blessed Sunday!

-------------------------- Type-u-later, http://www.teaquilts.com

Friday, August 24, 2012

Bath Remodel Day 5, maybe 6 too

Yeah, now I see progress!  I have a tub.  It's all install inside the wall.  While on the subject of inside the wall, we had another problem.  Prior to purchasing this home, a bathroom was installed in the basement.  When the toilet was installed, they inserted the vent pipe upwards (as it should be) but didn't attach it to the main stack.  I guess they didn't want to rip out the wall to finish the job correctly. My family has looked at me strangely on occasion when I would walk into the house and say, "what's that smell?"  I have a very picky nose.  Well, I was validated yesterday and the problem was corrected today, prior to closing the wall.
 Picture showing shower head that was raised about seven inches.
 Had to remove the door today so we could install the remaining drywall.
 Here is where the new sink is going.  Yeah, no big hole in the wall anymore!
The downside of this day is that I now have sand dust all over my home and it will get worse before it gets better.  Tomorrow, day 6 will be another day of sanding.

Hopefully on Monday, Day 7, the painting will start.  Can you guess the new color of the bath?

-------------------------- Type-u-later, http://www.teaquilts.com

Thursday, August 23, 2012

Bath Remodel Days 2-4

Day 2-3 photos are shown.  Today is Day 4 and the only difference is that all the pink drywall has been replaced.  All the walls have been taped and some type of "putty" (sorry, don't know the correct term) has been put on top.  Some parts were done yesterday and they were sanded.  One more day of sanding is needed.  Hopefully after the sanding, the floor boards for the cast iron tube needs to be replaced.  We did find another problem though.  The pipe that emits toilet fumes from the bathroom in the basement is not connected to the stack.  We'll get that fixed tomorrow (of course for an additional fee) LOL.  I have no problem paying for the service as Mike, the contractor, is doing an excellent job!

This framing is for the medicine cabinet.  It's square with beveled edges.  I wanted to have a white frame around it but couldn't find one with it already included.  By the time we build a frame around it, I will not have room for the over the toilet shelf unit.
 Sink area is all closed up instead of open square as we are getting a pedestal sink.  Hopefully it will make the bathroom appear a little larger over having a vanity.
 So my husband and I had a disagreement on where the recessed box in the shower should be placed.  The contractor turned around and said, I'll just make two!  We are both happy.
New ceiling light has been installed over the bathtub/shower area.  Yeah, no more dark showers!

-------------------------- Type-u-later, http://www.teaquilts.com

Monday, August 20, 2012

Bath Remodel Day 1-not quilt related

I'm so excited to FINALLY get rid of the pink walls in the bathroom.  We are gutting the bathroom down to nothing but studs and starting over from scratch.  I was so sick of the pink walls that I purchased a blue/green shower curtain!  This bathroom hasn't had any work since 2006 when I painted it pink to cover imperfections in the drywall.  We did the tile at the same time, but everything else was as we purchased it.

Here are the before walls.  I took as much of the wall as I could get in the photos.  This room is only 5'x6' not including the tub so it's very, very tiny.

 I'm tired of the lights and medicine cabinet.  Not enough space to hide the clutter. I need more space to hold hair care products.
 My contractor couldn't start work until today, so I hired an electrician to update the electrical work in the bathroom to ground the outlets.  That left a hole in the wall.  The electrician offered to fix it but I declined as I was having it fixed three months later anyway.  See the hair care products on the sink, bad, bad, bad.
 So sick and tired of the white, old fashion 4" square tiles.  And you can see that the resurfaced tub is starting to turn blue.  So blue in fact that it started making me blue.
 Just plain old vinyl flooring.  I just plain old hate it!  You've got to go.











WARNING - Very nasty looking photos are following - nothing pretty here.

Well today arrived and so did my contractor.  I was so excited even though I knew I'd be without my bathroom for 7-9 days.  He first removed the sink, toilet and tub.  Repaired and updated some of the plumbing, especially since our cutoff valves to the sink and toilet decided to malfunction, leaking water all over the floor!
This is the tub wall.  It had a window that was covered when we tiles the bathroom in 1996.  Then about two years ago we replaced the siding outside the home and covered the other side of the window.  The window will now be completely removed.  This wall also is an outside wall so I guess the insulation will need to be replaced as well.  (Oh, that means I get to do more shopping, yeah!)

Now, he promises to return tomorrow and I'm praying that he does.  I don't think me and my husband could put this room back together.  I'll be back soon with Day 2 photos.
.

-------------------------- Type-u-later, http://www.teaquilts.com